Current Project Listing
    Completed Project Listing
General Building Work
Sanitary and Sewer System
Plumbing System
Gas Reticulation System
Fire Hydrant, Fire Hosereel, Wet/Dry Riser and Fire Fighting System
RWDP System
    Completed Project Gallery
 
     
 
Completed Project Listing:

  A. General Building Work

S/N Catalogues Contract Name Client/ Owner/ Main Contractor Scope of Works Contract Period
1. Commercial Proposed Additions & Alternations with Addition of 1 2nd Storey Office to the Existing Single Storey Canteen cum Canteen Block of the Shipyard at 3 Pandan Road Main Contractor
Zheng Keng Engineering & Construction Pte Ltd
Consultants:
Partnership Consult
Scope of works
General Building Work
14 Dec 2003
To
13 Aug 2004
2. Industrial Proposed Erection of A Single-Storey Single-User Industrial Building with A 4-Storey Ancillary Office Block on Lot 333T MK 7 at Gul Circle / Gul Way (Phase 1) Main Contractor
Zheng Keng Engineering & Construction Pte Ltd Consultants:
Partnership Consult
Scope of works
General Building Work
15 Dec 2005
to
31 May 2006
3. Private Housing 18 West Coast Grove Main Contractor
Zheng Keng Engineering & Construction Pte Ltd
Consultants:
N K Lim Architect
Scope of works
General Building Work
01 Mar 2007
To
30 Apr 2008
4. Others Construct of 3 Covered Linkways at N1/N2 Rivervale Street/Punggol Field Main Contractor
Zheng Keng Engineering & Construction Pte Ltd
Consultants:
Lee & Lee Consultants
Scope of works
General Building Work
15 Sep 2005
to
03 Aug 2006


B. Sewer System

S/N Catalogues Contract Name Client/ Owner/ Main Contractor Scope of Works Contract Period
1. General Demolition Works for Grukha Camp @ Mount Vernon (Site 1 & Site 2) Main Contractor
Tew Kim Thai Construction Pte Ltd
Consultants:
CPG Consultants Pte Ltd
Scope of works
Seal up of Existing Sewer Connection From IC to Existing MH
Jan 2004
To
Mar 2004
2. General Teban Garden (Phase 3) Replacement of Soil Stacks Main Contractor
Zheng Keng Engineering & Construction Pte Ltd
Scope of works
Replacement of Soil Stack
May 1994
To
Nov 1994
3. General Teban Garden (Phase 2)
Replacement of Soil Stacks 
Main Contractor
Zheng Keng Engineering & Construction Pte Ltd
Scope of works
Replacement of Soil Stack
May 1991
To
Nov 1994
4. General Teban Garden (Phase 5)
Replacement of Soil Stacks 
Main Contractor
Zheng Keng Engineering & Construction Pte Ltd
Scope of works
Replacement of Soil Stack
Sep 1994
To
Dec 1994


C. Plumbing System

S/N Catalogues Contract Name Client/ Owner/ Main Contractor Scope of Works Contract Period
1. Public Housing Replacement of Water Pipes to 19 Blks at Blk 301, 302, 311 to 314, 322 to 329, 343 to 346 and 348 Ang Mo Kio Ave. 3 Main Contractor
Zheng Keng Engineering & Construction Pte Ltd
Scope of works
Replacement of Water Pipe
02 Jan 2008
To
01 Dec 2008


D. Sanitary & Plumbing System

S/N Catalogues Contract Name Client/ Owner/ Main Contractor Scope of Works Contract Period
1. Private Housing Bedok Grove
(4 units Terrace House)
Main Contractor
TPS Construction Pte Ltd
Consultants:
Technoon Engineers
Scope of works
Sanitary & Plumbing  Installation
Nov 1999
To
Jun 2000
2. Private Housing 10 Greenleaf Grove Main Contractor
ACLM Engrg & Constrn Pte Ltd
Consultants:
N K Lim Architects
Scope of works
Sanitary & Plumbing  Installation
May 2001
To
Feb 2002
3. Private Housing Gold Coast Condominium at Pasir Panjang Road Main Contractor
Construction Technology Pte Ltd
Consultants:
J M Pang & Seah (Pte) Ltd
Scope of works
Sanitary & Plumbing Installation
Jul 1992
To
Feb 1994
4. Private Housing Proposed Condominium Development of 4 blocks 10 sty, 3 blocks 16 sty at Jurong West Parc Vista (650 units) Main Contractor
Keong Hong Construction Pte Ltd
Consultants:
RUST JRP Pte Ltd
Scope of works
Sanitary & Plumbing Installation
Dec 1995
To
Apr 1998
5. Private Housing Proposed Erection of 1 block 11 sty Residential Flat with Swimming Pool and a Basement Carpark at 17 Shanghai Road Regency Lodge (20 units) Main Contractor
China Construction (SP) Development Co. Pte Ltd
Consultants:
United Project Consultant Pte Ltd
Scope of works
Sanitary & Plumbing Installation
Mar 1997
To
Dec 1998
6. Private Housing Proposed 2 blocks 4 sty with Attic Flat Development at Holland Road Fairlodge Apartment (22 units) Main Contractor
TPS Consultant Pte Ltd
Consultants:
Kinhill Tan Pte Ltd
Scope of works
Sanitary & Plumbing Installation
May 1998
To
Feb 1999
7. Private Housing Proposed Condominium Housing Development at Toh Yi Drive / Toh Tuck Road High Oak (192 units) Main Contractor
TPS Construction Pte Ltd
Consultants:
Meinhardt (S) Pte Ltd
Scope of works
Sanitary & Plumbing Installation
Apr 1997
To
Oct 1999
8. Private Housing Proposed Reconstruction of 2 sty Semi-Detached Dwelling House with an Attic at 26 Watten Terrace Main Contractor
ACLM Engineering & Constrcution Pte Ltd
Consultants:
AEP Consultant
Scope of works
Sanitary & Plumbing Installation
May 2001
To
Dec 2001
9. Private Housing Proposed Erection of a 9-sty Commercial Building with a Basement on Lot 196X, 177K TS 10 at High Street / North Bridge Rd ( High Street Office) Main Contractor
Santarli Construction Pte Ltd
Consultants:
Squire Mech Pte Ltd
Scope of works
Sanitary & Plumbing Installation
01 Mar 2008
To
31 Mar 2009
10. Industrial Proposed a 7-Storey Industrial Building @ Ang Mo Kio Industrial Park 2 N5 C25 (HDB Industrial Building) Main Contractor
Santarli Construction Pte Ltd
Consultants:
HDB
Scope of works
Sanitary & Plumbing Installation
Sep 1998
To
Apr 2000
11. Industrial Proposed 6nos 5-Storey & 22nos 4-Storey Landed Terrace Units at Ubi Ave 1 ( Ubi TechPark (2A & 2B) Main Contractor
Santarli Construction Pte Ltd
Consultants:
Parsons Brinckerhoff Consultants Pte Ltd
Scope of works
Sanitary & Plumbing Installation
Jan 2000
To
May 2001
12. Community Club A & A to an Existing 3-Storey Fengshan Community Club at 20 Bedok North Street 2 ( Fengshan Community Club) Main Contractor
ACLM  Engrg & Constrn Pte Ltd
Consultants:
Integrated Building Consultants
Scope of works
Sanitary & Plumbing Installation
Jun 2000
To
May 2001
13. Public Housing Taman Jurong C9 & C13 (HDB Upgrading) Main Contractor
Santarli Construction Pte Ltd
Consultants:
HDB
Scope of works
Sanitary & Plumbing Installation
Mar 1995
To
May 1997
14. Public Housing Balestier / Moulmein Upgrading (HDB Upgrading) Main Contractor
JDC-Santarli Joint Venture
Consultants:
HDB
Scope of works
Sanitary & Plumbing Installation
Nov 1996
To
Jul 1999


E. Sanitary, Plumbing & Gas Installation System

S/N Catalogues Contract Name Client/ Owner/ Main Contractor Scope of works Contract Period
1. Private Housing Proposed Executive Condominium Housing Development For 3 Blocks Of 18-Storey Residential Building With Basement Carpark, Swimming Pools & Ancillary Facilities at Ang Mo Kio Ave 9/Ave 6.
(Nuovo  Executive (297units)
Main Contractor:
Poh Lian Construction Pte Ltd
Consultant:
Squire Mech Pte Ltd
Scope of works
Sanitary, Plumbing & Gas Installation
Jan 2002
To
Jul 2004
2. Private Housing Proposed 1 Blk Storey Flat Development with A Basement Carpark and Swimming Pool at Essex Road
(Strata (100 units))  
Main Contractor:
TPS Construction Pte Ltd
Consultant:
United Project Consultants P/L
Scope of works
Sanitary, Plumbing & Gas Installation
13 Oct 2003
To
15 Jun 2006
3. Private Housing Proposed Condominium Development on Lot 746 PT, 767 & 935 TS 21 at River Valley Road
(The Urbana (126units))
Main Contractor:
Poh Lian Contruction P/L
Consultant:
J. Roger Preston (S) Pte Ltd
Scope of works
Sanitary, Plumbing & Gas Installation
16 Sep 2004
To
15 Apr 2007
4. Private Housing The Design & Build of Riviera Residences Condominium at Riviera Drive /Upper East Coast Road
(Riviera Residence (138units))
Main Contractor:
Chip Eng Seng Contractor
Consultant:
United Project Consultants P/L
Scope of works
Sanitary, Plumbing & Gas Installation
15 Apr 2005
To
30 Jun 2007
5. Private Housing Proposed Condominium Housing Development at Duchess Rd/ Duchess Avenue
(The Tresor (62units))
Main Contractor:
Poh Lian Construction P/L
Consultant:
Alpha Engineering Consultant
Scope of works
Sanitary, Plumbing & Gas Installation
24 Aug 2005
To
26 May 2007
6. Private Housing Proposed Condominium Housing Development Comprising 2 Blocks of 36-Storey Residential Flats with Basement Carparks, Swimming Pool and Communal Facilities at Kim Seng Rd/River Valley Rd
(The Cosmopolitan (228units))
Main Contractor:
Poh Lian Contruction Pte Ltd Consultant:
Beca Cater Hollings & Ferner (SE Asia) Pte Ltd
 
Scope of works
Sanitary, Plumbing & Gas Installation
28 Feb 2005
To
30 Apr 2008
7. Private Housing Proposed Condominium Housing Development Comprising 5 Blocks of 4-Sty Residential Building with Attic, Basement Carparks & Communal Facilities at Nassim Road
(Beaufort at Nassim (30units))
Main Contractor:
Poh Lian Construction Pte Ltd Consultant:
Squire Mech Pte Ltd
Scope of works
Sanitary, Plumbing & Gas Installation
1 May 2006
To
15 Jul 2008
8. Commercial Proposed Erection of 3-Storey Commercial Building at Rivervale Drive / Crescent
(Rivervale Mall)
Main Contractor
Santarli Construction Pte Ltd
Consultant:
Rankine & Hill (S) Pte Ltd
Scope of works
Sanitary, Plumbing & Gas Installation
Jul 1999
To
Jul 2000
9. Commercial Upgrading of Century Square Shopping Centre @ Tampiness Centre
(Century Square)
Main Contractor
Guthrie Construction & Retrofitting
Consultant:
Vincent Han & Associates
Scope of works
Sanitary, Plumbing & Gas Installation
Sep 2004
To
Apr 2005
10. Commercial Proposed Additions & Alterations to Hougang Mall Shopping Centre at Hougang Avenue 10
(Hougang Mall Shopping Centre)
Main Contractor
Guthrie Construction & Retrofitting
Consultant:
Vincent Han & Associates Pte Ltd
Scope of works
Sanitary, Plumbing & Gas Installation
19 Sep 2005
To
18 Sep 2006
11. Commercial Proposed Additions & Alterations to Whitesand Shopping Centre at Pasir Ris Central
(Whitesand Shopping Centre)
Main Contractor
Guthrie Construction & Retrofitting Pte Ltd
Consultant:
Vincent Han & Associates
Scope of works
Sanitary, Plumbing & Gas Installation
2 May 2006
To
3 May 2007
12. Commercial Proposed Additions & Alterations to Liang Court Shopping Centre at River Valley Road.
(Liang Court Shopping Mall)  
Main Contractor
Guthrie Construction & Retrofitting Pte Ltd
Consultant:
Vincent Han & Associates
Scope of works
Sanitary, Plumbing & Gas Installation
01 May 2007
To
01 Dec 2008
13. General Proposed New Columbarium & Crematorium Complex at Mandai Road Main Contractor
Santarli Construction Pte Ltd
Consultants:
CPG Consultants Pte Ltd
 Scope of works
Sanitary, Plumbing & Gas Installation
Jan 2002
To
Apr 2004


F. Sanitary, Sewer & Plumbing System

S/N Catalogues Contract Name Client/ Owner/ Main Contractor Scope of Works Contract Period
1. Private Housing Cashew Villa (58units Terrace House) Main Contractor
TPS Construction Pte Ltd
Consultants:
Enkon International
Scope of works
Sanitary, Plumbing & Minor Sewer  Installation
Jul 2000
To
Aug 2002
2. Private Housing Greenwood Ave (10units Terrace House) Main Contractor:
TPS Construction Pte Ltd
Consultant:

Belmacs Consulting Engineers
Scope of works
Sanitary, Plumbing & Minor Sewer  Installation
Aug 2000
To
Aug 2002
3. Private Housing Proposed Executive Condominium Housing Development For 2 Blocks of 35-Storey Apartment with a Basement Carpark and 1 Blk 4 Storey Multi-Storey Carpark & Swimming Pool at Bishan Street 11
(Bishan Loft)
Main Contractor
Chip Eng Seng Contractors (1988) P/L
Consultants:
PTP Engineers
Scope of works
Sanitary, Plumbing, Gas & Wet Riser Installation
Dec 2000
To
Oct 2003
4. Private Housing Proposed Conventional Housing Development of Detached Housing at Holland Grove Drive
Holland Grove
Main Contractor
TPS Construction Pte Ltd
Consultants:
Kinhill Tan Pte Ltd
Scope of works
Sanitary, Plumbing, Gas & Wet Riser Installation
Mar 1995
To
Jun 1997


G. Sanitary, Pluming, Gas, Dry Riser & RWDP System

S/N Catalogues Contract Name Client/ Owner/ Main Contractor Scope of Works Contract Period
1. Public Housing Hougang N9 C10 (753units) Main Contractor
Kay Lim Construction & Trading Pte Ltd
Consultants:
HDB
Scope of works
Sanitary, Water, Gas, Dry Riser & RWDP System
Aug 1999 
To 
Dec 2001
2. Public Housing Sembawang N4 C9 (447units)
(HDB Design Plus)
Main Contractor:
Chip Eng Seng Contractors (1988) Pte Ltd
Consultant:

Surbana Int’l (Consultant) Pte Ltd
Scope of works
Sanitary, Water, Gas, Dry Riser & RWDP System
Apr 2002
  To
 Oct 2004  
3. Public Housing Sengkang N2 C37 (433units)
(HDB Design Plus)
Main Contractor
Santarli Construction Pte Ltd
Consultants:
Surbana Int’l (Consultant) Pte Ltd
Scope of works
Sanitary, Water, Gas, Dry Riser & RWDP System
15 Sep 2004
To
26 Feb 2008
4. Public Housing Jurong West N6 C2 Main Contractor
LKH-Shun Shing
Consultants:
United Project Consultants Pte Ltd
Scope of works
Sanitary, Water, Gas, Dry Riser & RWDP System
Jul 1994
To
Jan 1997
5. Public Housing Woodlands N5C3 Main Contractor
Construction Technology Pte Ltd
Consultants:
HDB
Scope of works
Sanitary, Water, Gas, Dry Riser & RWDP System
Oct 1995
To
May 1998
6. Public Housing Jurong West N6 C23 Main Contractor
Santarli Construction Pte Ltd
Consultants:
HDB
Scope of works
Sanitary, Water, Gas, Dry Riser & RWDP System
Sep 1998
To
May 2000


H. Sanitary, Plumbing, Gas, Sewer, Wet/Dry Riser and RWDP System

S/N Catalogues Contract Name Client/ Owner/ Main Contractor Scope of Works Contract Period
1. Public Housing Sengkang N4 C6 (715units)
(HDB Design & Build)
Main Contractor
Kay Lim Construction & Trading Pte Ltd
Consultants:
P Tan & Partners Consulting Engineers
Scope of works
Sanitary, Water, Gas, Wet/Dry Riser, RWDP & Minor Sewer System
Jul 2000
 To
Jan 2003
2. Public Housing Punggol East C5A (450units)
(HDB Design Plus)
Main Contractor:
Kay Lim Constrn & Trading Pte Ltd
Consultant:

Surbana Int’l (Consultant) Pte Ltd
Scope of works
Sanitary, Water, Gas, Wet/Dry Riser, RWDP & Minor Sewer System
29 Oct 2003
To
29 Nov 2005
3. Public Housing Punggol East C 31 (582units)
(HDB Design Plus)
Main Contractor
Poh Lian Contruction P/L
Consultants:
Surbana Int’l (Consultant) Pte Ltd
Scope of works
Sanitary, Water, Gas, Wet/Dry Riser, RWDP & Minor Sewer System
15 Dec 2003
To
02 Aug 2006


I. Sanitary, Plumbing, Gas, Fire Hosereel, Fire Hydrant & Dry Riser Installation

S/N Catalogues Contract Name Client/ Owner/ Main Contractor Scope of Works Contract Period
1. Institution Proposed Erection 1 Primary School at Woodlands Drive 62 (Woodlands Site 19) (Greenwood Pri. School) Main Contractor
Santarli Construction Pte Ltd
Consultants:
CPG Consultants Pte Ltd
Scope of works
Sanitary, Plumbing, Gas, Fire Hosereel, Fire Hydrant & Dry Riser Installation
Aug 1999
To
Oct 2000
2. Institution Proposed Erection 1 Secondary School Development Comprising of 2 Blocks of 3-Storey, 6 Blocks of 4-Storey with other Ancillary Building at Woodlands Avenue 1 (Woodland Site 13)
(Christ Church Sec. School)
Main Contractor
Santarli Construction Pte Ltd
Consultants:
CPG Consultants Pte Ltd
Scope of works
Sanitary, Plumbing, Gas, Fire Hosereel, Fire Hydrant & Dry Riser Installation
Jun 2000
To
Oct 2001
3. Institution Proposed A & A to Northview Primary School at 210 Yishun Ave 6
(Northview  Pri. School)
Main Contractor
Santarli Construction Pte Ltd
Consultant:
Thia & Associates
Scope of works
Sanitary, Plumbing, Gas, Fire Hosereel, Fire Hydrant & Dry Riser Installation
Jan 2001
To
Nov 2002
4. Institution Proposed A & A to Yuying Secondary School at 47 Hougang Avenue 1 (Yuying Sec. School) Main Contractor
Santarli Construction Pte Ltd
Consultant:

Parsons Brinckerhohh Pte Ltd
Scope of works
Sanitary, Plumbing, Gas, Fire Hosereel, Fire Hydrant & Dry Riser Installation
Mar 2001
To
Jan 2003
5. Institution Proposed A & A to Admiralty Primary School at Woodlands Circle (Admiratly Pri. School) Main Contractor
Santarli Construction Pte Ltd
Consultant:
Enkon International
Scope of works
Sanitary, Plumbing, Gas, Fire Hosereel, Fire Hydrant & Dry Riser Installation
Mar 2002
To
Oct 2004
6. Institution Proposed A & A to Mayflower Secondary School at Ang Mo Kio Street 21
(Mayflower Sec. School)
Main Contractor
Santarli Construction Pte Ltd
Consultant:
CPG Consultants Pte Ltd
Scope of works
Sanitary, Plumbing, Gas, Fire Hosereel, Fire Hydrant & Dry Riser Installation
Jun 2003
To
Jun 2005
7. Institution Proposed Rebuilding and Improving works to Existing Geylang Methodist Secondary School at No.2 Geylang East Central
(Geylang Methodist Sec. School)
Main Contractor
Santarli Construction Pte Ltd
Consultant:
Beca Cater Hollings & Ferner (SE Asia) Pte Ltd  
Scope of works
Sanitary, Plumbing, Gas, Fire Hosereel, Fire Hydrant & Dry Riser Installation
30 Sep 2005
To
30 May 2007
8. Institution Proposed Rebuilding of Part 4, 5 & 6 Storey Convent of The Holy Infant Jesus (Katong) Primary School with a Basement Storey Consists of Carparks, Music Rooms and Music Store at 17 Martia Road.
(CHIJ Katong Pri. School)
Main Contractor:
Santarli Construction Pte Ltd
Consultant:

JM Pang & Associates
Scope of works
Sanitary, Plumbing, Gas, Fire Hosereel, Fire Hydrant & Dry Riser Installation
05 Apr 2007
To
04 Oct 2008
9. Institution Proposed Upgrading to Existing Dunman Secondary School on Lot 1527v Mk 31 Tampines Street 45
(Dunman Sec. School)
Main Contractor:
Santarli Construction Pte Ltd
Consultant:
PTP Engineers
Scope of works
Sanitary, Plumbing, Gas, Fire Hosereel, Fire Hydrant & Dry Riser Installation
01 Jun 2007
To
31 July 2009
10. Institution Proposed Additions & Alterations to Hong Kah Sec School Involving the Erection of 3 Blocks of 2-4 Sty Buildings and Other Ancillary Buildings on Lot 03032M Mk 06 at No. 931 Jurong West St 42
(Hong Kah Sec. School)
Main Contractor:
Santarli Construction Pte Ltd
Consultants:

CPG Consultants Pte Ltd
Scope of works
Sanitary, Plumbing, Gas, Fire Hosereel, Fire Hydrant & Dry Riser Installation
11 Aug 2008
To
10 Nov 2009